
The quietest room in the house.
Velux, dormer and mansard loft conversions in Sutton Coldfield. Most need no planning, and most are built in under ten weeks.
- Planning checked before you pay a penny
- Acoustic floor as standard
- Building Control sign-off
- 10-year insurance-backed guarantee
Rooms we've built
Rooms in Four Oaks, Boldmere and Walmley, photographed after handover.

Velux conversion, Four Oaks, 7 weeks 
Gable window, Boldmere, 8 weeks 
New loft stair, Walmley, part of a 9-week dormer
Loft conversions, priced up front.
Starting prices for a typical Sutton Coldfield home. Your visit gives you a fixed price in writing.

Velux loft conversions
No change to the roofline. Quickest to build, least disruption.
From£32,000Typical build 5–7 weeks
Dormer loft conversions
The most headroom and floor space. Often permitted development at the rear.
From£48,000Typical build 8–10 weeks
Mansard loft conversions
A near-upright rear wall and a flat top. The most room a loft can give, usually with planning.
From£68,000Typical build 10–12 weeks
5.0 from 38 Google reviews
What customers in Four Oaks and Walmley said.
We were sure a dormer would need planning. They checked it against the permitted-development limits on the first visit and it didn't.
Charlotte M.Four OaksThe acoustic floor was the bit I cared about. Our son practises drums up there and we barely hear it downstairs.
Greg A.WalmleyVelux conversion finished in six weeks. We never had to move out and the hall carpet was covered the whole time.
Nadia R.Boldmere
Example reviews for an example business.
Four steps to a quiet room
Planning answered first, then a build designed around sound.
- Planning check
On the survey we measure the loft and check it against the permitted-development limits there and then.
- Written answer and price
Within a week: the planning answer in writing, the drawings brief and a fixed price.
- Built for quiet
Acoustic insulation between the joists and a resilient layer under the boards, laid before any wall goes up.
- Sign-off
Building Control's completion certificate, then the 10-year guarantee in your name.
Planning answered before you commit.
On the survey we check your loft against the permitted-development limits and tell you in writing whether you need planning. If our answer is wrong and you need an application we said you wouldn't, we pay for it. Every build carries a 10-year insurance-backed guarantee.
Book a free surveyWhat people ask first
General guidance for England. We check your home's details on the visit.
Do I need planning permission for a loft conversion?
Many loft conversions are permitted development and don't need planning permission, as long as the extra volume is within 40 cubic metres for terraced houses or 50 for detached and semi-detached, nothing extends beyond the front roof slope, and there are no balconies. Dormers on the front, and homes in conservation areas, usually need permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Does a loft conversion need Building Regulations approval?
Yes. Every loft conversion needs Building Regulations approval, covering the floor structure, fire escape, stairs, insulation and ventilation. You get a completion certificate at the end, which you'll need when you sell.
Do I need a party wall agreement?
If your house shares a wall with next door, as most semis and terraces do, the Party Wall etc. Act 1996 means you must give your neighbour written notice before work on that wall starts, usually two months for a loft where steels sit in the shared wall. They can agree in writing or appoint a surveyor. We prepare and serve the notices for you.
Will we need to move out?
Usually not. Most of the work is done from the scaffold and through the roof, so the house below stays in use. The noisiest, dustiest part is cutting in the new staircase, which takes a few days near the end. We seal off the landing while it happens.
How long does a loft conversion take?
On site, a Velux conversion usually takes 5 to 7 weeks, a dormer 8 to 10 and a hip-to-gable or mansard 9 to 12. Allow another 6 to 10 weeks before that for drawings, Building Regulations and any planning or party wall notices.
Sutton Coldfield and nearby
Loft conversions across Sutton Coldfield and nearby:
Book a free survey
Tell us a little about the job. We call back within one working day to arrange a time.