See a rough price before we visit.
Single-storey rear, single-storey side and double-storey extensions in Walsall and Aldridge. Move the slider for a starting figure, then book a free survey for a fixed one.

- Prices on the page, not on request
- Fixed quote within a week of survey
- Handover date in the contract
- Insurance-backed guarantee
House extensions, priced up front.
Starting prices for a typical Walsall semi. The slider above uses the same figures.

Single-storey rear extensions
Up to 3 metres on most semis without full planning permission.
From£38,000Typical build 10–12 weeks
Single-storey side extensions
A utility room, downstairs WC or study along the side of a semi.
From£34,000Typical build 8–10 weeks
Double-storey extensions
A bigger ground floor and an extra bedroom above. Needs planning permission.
From£85,000Typical build 16–22 weeks
From slider to handover date
A starting figure now, a fixed price and a handover date after the survey.
- Rough price online
Use the slider for a starting figure. It covers a standard finish and leaves out kitchen units and VAT.
- Survey and fixed quote
We measure up and send a fixed quote within a week, with the handover date written in.
- Approvals
Planning or lawful development, Building Regulations and party wall notices done before we start.
- Build to the date
Weekly progress against the programme, and £100 a working day off if we hand over late for a reason that's ours.
4.7 from 204 Google reviews
What customers in Walsall and Aldridge said.
The website said about £52,000 for our size. The fixed quote came back at £54,300 with the steel in. No shocks.
Kirsty D.AldridgeDouble-storey for my mum to move in downstairs. Handed over two days early, and they'd told us the date in March.
Imran H.BloxwichQuick to reply and honest about what the slider leaves out. The kitchen units were extra, as it said.
Paul W.Pelsall
Example reviews for an example business.
Jobs against the programme
Jobs on the programme, with the week they reached each stage.

Single-storey rear, Aldridge: handed over in week 11, as dated 
Double-storey side, Bloxwich: roof on in week 9 of 18 
Single-storey rear, Pelsall: footings done in week 2 of 11
A handover date in your contract.
Your contract names the day we hand over. If we miss it for a reason that's ours, we take £100 off the final bill for every working day over.
Book a free surveyWhat the price covers
General guidance for England. We check your home's details on the visit.
Do I need planning permission for an extension?
A single-storey rear extension is often permitted development: up to 3 metres deep on an attached house or 4 metres on a detached one, no more than 4 metres high, and covering no more than half the garden. Larger rear extensions (up to 6 or 8 metres) are possible through the prior approval scheme. Two-storey and side extensions usually need planning permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Does an extension need Building Regulations approval?
Yes. All extensions need Building Regulations approval for the structure, foundations, insulation, drainage and fire safety, even when planning permission isn't required.
Will I need a party wall agreement?
If you build on or up to a shared wall, or dig footings within 3 metres of a neighbour's foundations, the Party Wall Act applies. Notice goes out one or two months before work starts, depending on the work. If your neighbour agrees in writing, no surveyor is needed. We draw up and serve the notices as part of the job.
What if there's a drain or sewer where the extension goes?
Many homes have a shared sewer running across the back. Building over it, or within 3 metres of it, needs a build-over agreement from your water company, sometimes after a camera survey of the pipe. We check the sewer maps before we price the job and make the application for you.
Can we live at home during the build?
Usually, yes. Most of the work happens outside until the new room is weathertight. The disruptive part is knocking through to the house, which we do near the end behind a dust screen. Expect two to four weeks without a full kitchen; we set up a temporary sink and agree the date with you.