
Quoted in five working days.
Single-storey rear extensions, side extensions and kitchen extensions in West Bromwich, Oldbury and Smethwick. Tell us about the job and we'll book your survey.
- Itemised quote in five working days
- Building Control sign-off included
- Skips and waste removal included
- Insurance-backed guarantee
House extensions, priced up front.
Starting prices for a typical Sandwell semi. Your itemised quote follows within five working days of the survey.

Single-storey rear extensions
Up to 3 metres on most semis without full planning permission.
From£38,000Typical build 10–12 weeks
Single-storey side extensions
A utility room, downstairs WC or study along the side of a semi.
From£34,000Typical build 8–10 weeks
Kitchen extensions
Open-plan kitchen and dining space with bi-folds and a roof lantern or rooflights.
From£45,000Typical build 10–14 weeks
4.8 from 129 Google reviews
What customers in West Bromwich and Oldbury said.
Filled in the form on Sunday night, survey on Wednesday, quote in my inbox the next Monday. Every line priced.
Natalie C.OldburySide extension for a utility and WC. They cleared the site every evening because we've got two little ones.
Mark J.Great BridgeThe quote showed the drainage diversion as its own line, so we knew exactly why it cost what it did.
Sunita B.Smethwick
Example reviews for an example business.
From form to fixed quote
You'll know what it costs, line by line, within a week of us visiting.
- Tell us about the job
Use the form or call. We ring back within one working day to book the survey.
- Survey
We measure up, check drains and boundaries, and note anything that affects the price.
- Itemised quote in five working days
Every stage, every allowance and the VAT on its own line. Nothing to sign until you've read it.
- Build and sign-off
Skips, waste and Building Control sign-off included, then your insurance-backed guarantee.
Recent jobs, with the facts
Recent jobs, with the facts that went into the quote.

Side and rear in matching stone, Rowley Regis, 15 weeks 
Single-storey rear, Oldbury: week 4 of 11, back wall out 
Kitchen knocked through to the lounge, Smethwick, 10 weeks
Every line priced before you sign.
After the survey you get an itemised quote within five working days: every stage, every allowance and the VAT shown. Nothing to sign until you've read it.
Book a free surveyCommon questions
General guidance for England. We check your home's details on the visit.
Do I need planning permission for an extension?
A single-storey rear extension is often permitted development: up to 3 metres deep on an attached house or 4 metres on a detached one, no more than 4 metres high, and covering no more than half the garden. Larger rear extensions (up to 6 or 8 metres) are possible through the prior approval scheme. Two-storey and side extensions usually need planning permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Does an extension need Building Regulations approval?
Yes. All extensions need Building Regulations approval for the structure, foundations, insulation, drainage and fire safety, even when planning permission isn't required.
Will I need a party wall agreement?
If you build on or up to a shared wall, or dig footings within 3 metres of a neighbour's foundations, the Party Wall Act applies. Notice goes out one or two months before work starts, depending on the work. If your neighbour agrees in writing, no surveyor is needed. We draw up and serve the notices as part of the job.
What if there's a drain or sewer where the extension goes?
Many homes have a shared sewer running across the back. Building over it, or within 3 metres of it, needs a build-over agreement from your water company, sometimes after a camera survey of the pipe. We check the sewer maps before we price the job and make the application for you.
Can we live at home during the build?
Usually, yes. Most of the work happens outside until the new room is weathertight. The disruptive part is knocking through to the house, which we do near the end behind a dust screen. Expect two to four weeks without a full kitchen; we set up a temporary sink and agree the date with you.
West Bromwich and nearby
House extensions across West Bromwich and nearby:
Book a free survey
Tell us a little about the job. We call back within one working day to arrange a time.