- Trial holes dug before we quote
- Planning drawings included
- Your own site manager, start to finish
- 10-year insurance-backed guarantee
Family rooms we've finished
Finished jobs from the last two years. Ask us for the address of one near you and we'll arrange a visit.

Orangery dining room, Four Oaks, 11 weeks 
Orangery family room, Little Aston, 12 weeks 
Kitchen extension, Walmley, 12 weeks
House extensions, priced up front.
Starting prices for a typical Sutton Coldfield home, with build times. The survey gives you a fixed price in writing.

Kitchen extensions
Open-plan kitchen and dining space with bi-folds and a roof lantern or rooflights.
From£45,000Typical build 10–14 weeks
Wraparound extensions
Side and rear in one L-shape. Usually needs full planning permission.
From£72,000Typical build 14–18 weeks
Orangeries
Brick piers, a solid perimeter roof and a glazed lantern. Warmer than a conservatory all year.
From£48,000Typical build 10–12 weeks
From trial holes to handover
One site manager from the first visit to the last snag.
- Survey and trial holes
We measure up, dig trial holes to see what the ground is like and talk through the layout. Free, about an hour.
- Drawings and planning
Our technician draws it. We apply for planning or a lawful development certificate and book Building Control.
- The build
Your site manager runs it from footings to decorating and sends photos every Friday.
- Handover
A walk-round together, snags cleared, the completion certificate and your 10-year guarantee.
4.9 from 143 Google reviews
What customers in Sutton Coldfield and Four Oaks said.
They dug trial holes before quoting, found clay, and priced deeper footings in from the start. The final bill matched the quote to the pound.
Rachel T.Four OaksThe wraparound needed full planning. Their drawings went through first time and the build took 16 weeks, as promised.
Dev P.WalmleySame site manager every day. He sent photos on Friday so we knew where things stood over the weekend.
Joanne M.Boldmere
Example reviews for an example business.
Your price is fixed when you sign.
The figure in your quote is the figure you pay, unless you change the design. We check the ground with trial holes before quoting, so foundations don't turn into an extra halfway through.
Book a free surveyBefore you extend
General guidance for England. We check your home's details on the visit.
Do I need planning permission for an extension?
A single-storey rear extension is often permitted development: up to 3 metres deep on an attached house or 4 metres on a detached one, no more than 4 metres high, and covering no more than half the garden. Larger rear extensions (up to 6 or 8 metres) are possible through the prior approval scheme. Two-storey and side extensions usually need planning permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Does an extension need Building Regulations approval?
Yes. All extensions need Building Regulations approval for the structure, foundations, insulation, drainage and fire safety, even when planning permission isn't required.
Will I need a party wall agreement?
If you build on or up to a shared wall, or dig footings within 3 metres of a neighbour's foundations, the Party Wall Act applies. Notice goes out one or two months before work starts, depending on the work. If your neighbour agrees in writing, no surveyor is needed. We draw up and serve the notices as part of the job.
What if there's a drain or sewer where the extension goes?
Many homes have a shared sewer running across the back. Building over it, or within 3 metres of it, needs a build-over agreement from your water company, sometimes after a camera survey of the pipe. We check the sewer maps before we price the job and make the application for you.
Can we live at home during the build?
Usually, yes. Most of the work happens outside until the new room is weathertight. The disruptive part is knocking through to the house, which we do near the end behind a dust screen. Expect two to four weeks without a full kitchen; we set up a temporary sink and agree the date with you.
Sutton Coldfield and around
House extensions across Sutton Coldfield and nearby:
Book a free survey
Tell us a little about the job. We call back within one working day to arrange a time.
