Rooms we've drawn and built
Recent rooms, each drawn in 3D before it was built.

Glass side extension, Edgbaston, 14 weeks 
Garden room on a Victorian cottage, Moseley, 10 weeks 
Kitchen extension with three rooflights, Harborne, 12 weeks
- In-house designer, not a drawing service
- 3D views before you commit
- £450 design visit, refunded when you build
- Kitchen layout planned with the build
House extensions, priced up front.
Starting prices for a typical Harborne home. The design visit gives you sketches and a written budget range.

Orangeries
Brick piers, a solid perimeter roof and a glazed lantern. Warmer than a conservatory all year.
From£48,000Typical build 10–12 weeks
Kitchen extensions
Open-plan kitchen and dining space with bi-folds and a roof lantern or rooflights.
From£45,000Typical build 10–14 weeks
Contemporary extensions
Slim aluminium glazing, flat roofs and rooflights, designed around the garden.
From£60,000Typical build 12–16 weeks
From design visit to handover
It starts with one paid visit, and the fee comes back when you build.
- Design visit, £450
An hour at your house with our designer, measured sketches within a week and a written budget range.
- 3D design and fixed price
We draw the room in 3D, plan the kitchen with you and fix the price in writing.
- Planning and approvals
Planning or lawful development, Building Regulations and conservation-area consent where it's needed.
- Build and handover
Our own team builds it. The £450 comes off your final invoice.
Ten years on the build, insurance-backed.
The structure, roof and glazing are covered for ten years. The guarantee is insurance-backed, so it holds if we stop trading, and it passes to the next owner if you sell.
Book a design visit4.9 from 61 Google reviews
What customers in Harborne and Edgbaston said.
The design visit was worth every penny. She moved the sink to the island and suddenly the whole room worked.
Felicity A.EdgbastonWe saw the garden room in 3D from the lawn and from the kitchen before we signed. It looks exactly like that now.
Tom & Ana R.MoseleyConservation area, Victorian semi. They handled the planning officer and the brick matching with real care.
Margaret O.Harborne
Example reviews for an example business.
Things people ask our designer
General guidance for England. We check your home's details on the visit.
Do I need planning permission for an extension?
A single-storey rear extension is often permitted development: up to 3 metres deep on an attached house or 4 metres on a detached one, no more than 4 metres high, and covering no more than half the garden. Larger rear extensions (up to 6 or 8 metres) are possible through the prior approval scheme. Two-storey and side extensions usually need planning permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Does an extension need Building Regulations approval?
Yes. All extensions need Building Regulations approval for the structure, foundations, insulation, drainage and fire safety, even when planning permission isn't required.
Will I need a party wall agreement?
If you build on or up to a shared wall, or dig footings within 3 metres of a neighbour's foundations, the Party Wall Act applies. Notice goes out one or two months before work starts, depending on the work. If your neighbour agrees in writing, no surveyor is needed. We draw up and serve the notices as part of the job.
What if there's a drain or sewer where the extension goes?
Many homes have a shared sewer running across the back. Building over it, or within 3 metres of it, needs a build-over agreement from your water company, sometimes after a camera survey of the pipe. We check the sewer maps before we price the job and make the application for you.
Can we live at home during the build?
Usually, yes. Most of the work happens outside until the new room is weathertight. The disruptive part is knocking through to the house, which we do near the end behind a dust screen. Expect two to four weeks without a full kitchen; we set up a temporary sink and agree the date with you.
Harborne, Edgbaston and nearby
House extensions across Harborne and nearby:
Book a design visit
Tell us about the house and what the room needs to do. We call back within one working day to book the visit.
