Patios and drives, priced per m².
Porcelain and sandstone patios, block-paved driveways and garden walls in Wolverhampton. Slide to your size for a rough price.

- Price per m² in writing
- 150 mm compacted sub-base
- Permeable drives as standard
- Pay in three stages
Patios, drives and walls.
Starting prices. The slider gives a rough figure; the measure-up gives you a fixed one.

Porcelain and sandstone patios
Laid on a full mortar bed over a compacted sub-base, with a fall to drain.
From£3,600Laid in 4–7 days
Block-paved driveways
Permeable block paving on 150 mm of compacted sub-base, edged and kerbed.
From£5,200Laid in 5–8 days
Garden walls and steps
Brick, stone or sleeper retaining walls and steps, with drainage behind.
From£2,400Built in 3–6 days
Four stages, three payments
Four stages on site, and you pay for three of them as you see them done.
- Measure and quote
We measure, check the levels and the drains, and turn the slider's rough figure into a fixed price per m².
- Dig-out and sub-base
Dug out to depth, membrane down, then compacted stone in layers. You see the depth before anything is laid.
- Laying
Slabs on a full mortar bed, or blocks on screeded sand, with the fall away from the house checked as we go.
- Pointing and clean-down
Joints filled, blocks sanded and compacted, spoil taken away and everything washed down.
4.9 from 61 Google reviews
What customers in Wolverhampton and Tettenhall said.
The slider said about £5,000 for our patio. The written quote came in at £5,320 once they'd seen the slope. No surprises after that.
Steve O.TettenhallThey dug the old drive out to the proper depth and showed me the sub-base before a single block went down.
Karen L.PennFront drive is permeable, so no planning needed. They explained why on the first visit.
Imran A.Wednesfield
Example reviews for an example business.
Patios and drives we've laid
Projects across Wolverhampton, Tettenhall, Penn and nearby.

Dig-out and edge course, Tettenhall, day 2 
Herringbone blocks, kiln-dried sand joints 
Brick boundary wall rebuilt, Penn, 4 days
Pay as each layer goes down.
You never pay for work you haven't seen. The price is split into three stages, each signed off by you on site. Workmanship is guaranteed for ten years.
- Dig-out and sub-baseDepth checked with you: 150 mm of compacted stone under patios, more under drives.
- LayingLevels and falls checked with a straight-edge before any joint is filled.
- Pointing and clean-downA final walk-round, then the last third of the price.
Paving questions
General guidance for England. We check your home's details on the visit.
Do I need planning permission for landscaping?
Most garden landscaping doesn't need planning permission. The usual exceptions are paving a front garden with an impermeable surface, decking more than 30cm high, and fences over 2 metres. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Do I need planning permission to pave my front garden?
You don't need planning permission to pave a front garden if the surface is permeable (such as gravel, permeable block paving or porous resin) or rainwater drains onto a lawn or border. Covering more than 5 square metres with an impermeable surface that drains onto the road needs permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Where does the rain go on a new patio?
A patio is laid with a gentle fall, about 1 in 60, away from the house, and kept at least 150 mm below the damp-proof course. Water runs off to a lawn, a border, a channel drain or a soakaway. On clay soil or a patio that slopes towards the house, we add a channel drain and say so on the quote.
How long before we can use a new lawn?
Turf needs watering most days for the first two weeks unless it rains. Light use is fine after about three weeks, once the roots have taken and you can't lift a corner. Leave football and heavy wear for six to eight weeks. A lawn grown from seed takes two to three months.
How high can a garden fence be?
Without planning permission, up to 2 metres, or 1 metre where it runs next to a road or the pavement beside one. Trellis on top counts towards the height, measured from the ground on your side. Listed buildings, conservation areas and estates with covenants can be stricter, so we check before we order panels.
Wolverhampton and nearby
Landscape gardeners across Wolverhampton and nearby:
Book a free measure-up
Tell us roughly what you'd like laid. We call back within one working day to book the measure-up.