Built in brick. Priced in writing.
Kitchen, single-storey rear and double-storey extensions in Solihull and south Birmingham. One team from drawings to the last coat of paint.

- Architectural drawings included
- Planning and Building Regs handled
- Stage payments, never up front
- Insurance-backed guarantee
House extensions, priced up front.
Starting prices for a typical Solihull semi. Your written quote splits the price into the five stages below.

Kitchen extensions
Open-plan kitchen and dining space with bi-folds and a roof lantern or rooflights.
From£45,000Typical build 10–14 weeks
Single-storey rear extensions
Up to 3 metres on most semis without full planning permission.
From£38,000Typical build 10–12 weeks
Double-storey extensions
A bigger ground floor and an extra bedroom above. Needs planning permission.
From£85,000Typical build 16–22 weeks
Pay by the stage, not up front.
You pay for each stage once it's done and you've seen it. On a £45,000 kitchen extension that's £6,750 after the foundations, £11,250 at roof height, £11,250 once it's watertight, £6,750 after first fix and £9,000 at the finish.
- 15% · FoundationsSigned off by Building Control before you pay
- 25% · Walls to roof heightBrickwork, damp course and steels in, walked round with you
- 25% · Roof and glazingWatertight, doors fitted and the house secure again
- 15% · First fixWiring, plumbing and heating in, inspected before plastering
- 20% · FinishPlastered, floored and painted, with your completion certificate
How a Brickline job runs
Your quote shows the price of every stage before anything starts.
- Survey and fixed quote
We measure up and send a written quote with the price of each of the five stages.
- Drawings and approvals
Our technician draws it. We handle planning, Building Regulations and any party wall notices.
- Build in five stages
Each stage is finished and walked round with you before that payment is due.
- Handover
Completion certificate, a final walk-round and your insurance-backed guarantee.
Stages we've signed off
Stages from recent jobs. You see each one finished before you pay for it.

Foundations, Shirley, week 2: signed off before the first payment 
Walls to roof height, Knowle, week 5 
Steel in to open up the kitchen, Olton, week 6
4.8 from 86 Google reviews
What customers in Solihull and Shirley said.
Every payment was tied to a stage we could see finished. The kitchen extension came in on the quoted price, which nobody else would promise.
Hannah W.ShirleyThey drew it, got it through planning and built it. One phone number for the whole thing.
Sam R.KnowleThe brick match is spot on. Neighbours ask if it was always there.
Aisha K.Olton
Example reviews for an example business.
Questions before you build
General guidance for England. We check your home's details on the visit.
Do I need planning permission for an extension?
A single-storey rear extension is often permitted development: up to 3 metres deep on an attached house or 4 metres on a detached one, no more than 4 metres high, and covering no more than half the garden. Larger rear extensions (up to 6 or 8 metres) are possible through the prior approval scheme. Two-storey and side extensions usually need planning permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Does an extension need Building Regulations approval?
Yes. All extensions need Building Regulations approval for the structure, foundations, insulation, drainage and fire safety, even when planning permission isn't required.
Will I need a party wall agreement?
If you build on or up to a shared wall, or dig footings within 3 metres of a neighbour's foundations, the Party Wall Act applies. Notice goes out one or two months before work starts, depending on the work. If your neighbour agrees in writing, no surveyor is needed. We draw up and serve the notices as part of the job.
What if there's a drain or sewer where the extension goes?
Many homes have a shared sewer running across the back. Building over it, or within 3 metres of it, needs a build-over agreement from your water company, sometimes after a camera survey of the pipe. We check the sewer maps before we price the job and make the application for you.
Can we live at home during the build?
Usually, yes. Most of the work happens outside until the new room is weathertight. The disruptive part is knocking through to the house, which we do near the end behind a dust screen. Expect two to four weeks without a full kitchen; we set up a temporary sink and agree the date with you.
Solihull and south Birmingham
House extensions across Solihull and nearby:
Book a free survey
Tell us a little about the job. We call back within one working day to arrange a time.