
Planning sorted before the first brick.
Contemporary glass extensions, single-storey rear and double-storey extensions across Dudley and the Black Country. We check permitted development or submit your planning application in week one.
- Planning route confirmed in week one
- Party wall notices served for you
- Start date agreed in the contract
- 10-year structural guarantee
One glass corner, three views
One recent job in Sedgley, inside and out. Prior approval let it start eight weeks sooner than full planning.

Glass corner extension, Sedgley, 13 weeks 
Same job: the corner doors folded right back 
Same job: oak dressers kept, back wall taken out
House extensions, priced up front.
Starting prices for a typical Black Country semi, with build times. Your planning route is confirmed in week one.

Contemporary extensions
Slim aluminium glazing, flat roofs and rooflights, designed around the garden.
From£60,000Typical build 12–16 weeks
Single-storey rear extensions
Up to 3 metres on most semis without full planning permission.
From£38,000Typical build 10–12 weeks
Double-storey extensions
A bigger ground floor and an extra bedroom above. Needs planning permission.
From£85,000Typical build 16–22 weeks
5.0 from 38 Google reviews
What customers in Dudley and Sedgley said.
Two other builders said we'd need planning. Anvil Yard showed it fell under prior approval and saved us eight weeks.
Gurpreet S.SedgleyDouble-storey on a corner plot with a sewer under the side. They had the build-over agreement sorted before they dug.
Lee B.KingswinfordThe glazing went in on the day they said, six weeks after the order. Not one chase from us.
Claire H.Wordsley
Example reviews for an example business.
From planning check to sign-off
The planning question is answered before you commit to anything.
- Planning check in week one
We tell you in writing whether it's permitted development, prior approval or full planning.
- Drawings and notices
Structural calculations, Building Regulations drawings and party wall notices, served for you.
- Start date in the contract
Glazing is ordered when you sign, so the build doesn't stall waiting for it.
- Build and sign-off
Building Control sign-off, glazing certificates and the 10-year structural guarantee.
Ten years on the structure, in writing.
If a wall cracks, the roof leaks or a door drops in the first ten years, we come back and put it right. The guarantee is insurance-backed, so it still stands if we stop trading.
Book a free surveyPlanning, drains and neighbours
General guidance for England. We check your home's details on the visit.
Do I need planning permission for an extension?
A single-storey rear extension is often permitted development: up to 3 metres deep on an attached house or 4 metres on a detached one, no more than 4 metres high, and covering no more than half the garden. Larger rear extensions (up to 6 or 8 metres) are possible through the prior approval scheme. Two-storey and side extensions usually need planning permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.
Does an extension need Building Regulations approval?
Yes. All extensions need Building Regulations approval for the structure, foundations, insulation, drainage and fire safety, even when planning permission isn't required.
Will I need a party wall agreement?
If you build on or up to a shared wall, or dig footings within 3 metres of a neighbour's foundations, the Party Wall Act applies. Notice goes out one or two months before work starts, depending on the work. If your neighbour agrees in writing, no surveyor is needed. We draw up and serve the notices as part of the job.
What if there's a drain or sewer where the extension goes?
Many homes have a shared sewer running across the back. Building over it, or within 3 metres of it, needs a build-over agreement from your water company, sometimes after a camera survey of the pipe. We check the sewer maps before we price the job and make the application for you.
Can we live at home during the build?
Usually, yes. Most of the work happens outside until the new room is weathertight. The disruptive part is knocking through to the house, which we do near the end behind a dust screen. Expect two to four weeks without a full kitchen; we set up a temporary sink and agree the date with you.
Dudley and the Black Country
House extensions across Dudley and nearby:
Book a free survey
Tell us a little about the job. We call back within one working day to arrange a time.