Example design by Lumina. Anvil Yard is an invented business; prices, reviews and photos are illustrative.See all designs
0121 496 0358
A glass corner extension on the back of a brick house under an evening sky, lit inside with the corner doors open

Planning sorted before the first brick.

Contemporary glass extensions, single-storey rear and double-storey extensions across Dudley and the Black Country. We check permitted development or submit your planning application in week one.

5.0 from 38 Google reviews

One glass corner, three views

One recent job in Sedgley, inside and out. Prior approval let it start eight weeks sooner than full planning.

House extensions, priced up front.

Starting prices for a typical Black Country semi, with build times. Your planning route is confirmed in week one.

5.0 from 38 Google reviews

What customers in Dudley and Sedgley said.

Example reviews for an example business.

From planning check to sign-off

The planning question is answered before you commit to anything.

  1. Planning check in week one

    We tell you in writing whether it's permitted development, prior approval or full planning.

  2. Drawings and notices

    Structural calculations, Building Regulations drawings and party wall notices, served for you.

  3. Start date in the contract

    Glazing is ordered when you sign, so the build doesn't stall waiting for it.

  4. Build and sign-off

    Building Control sign-off, glazing certificates and the 10-year structural guarantee.

Ten years on the structure, in writing.

If a wall cracks, the roof leaks or a door drops in the first ten years, we come back and put it right. The guarantee is insurance-backed, so it still stands if we stop trading.

Book a free survey

Planning, drains and neighbours

General guidance for England. We check your home's details on the visit.

Do I need planning permission for an extension?

A single-storey rear extension is often permitted development: up to 3 metres deep on an attached house or 4 metres on a detached one, no more than 4 metres high, and covering no more than half the garden. Larger rear extensions (up to 6 or 8 metres) are possible through the prior approval scheme. Two-storey and side extensions usually need planning permission. This is general guidance for England; rules differ in Wales, Scotland and Northern Ireland, and for listed buildings, conservation areas and flats. Check with your local council before you start.

Does an extension need Building Regulations approval?

Yes. All extensions need Building Regulations approval for the structure, foundations, insulation, drainage and fire safety, even when planning permission isn't required.

Will I need a party wall agreement?

If you build on or up to a shared wall, or dig footings within 3 metres of a neighbour's foundations, the Party Wall Act applies. Notice goes out one or two months before work starts, depending on the work. If your neighbour agrees in writing, no surveyor is needed. We draw up and serve the notices as part of the job.

What if there's a drain or sewer where the extension goes?

Many homes have a shared sewer running across the back. Building over it, or within 3 metres of it, needs a build-over agreement from your water company, sometimes after a camera survey of the pipe. We check the sewer maps before we price the job and make the application for you.

Can we live at home during the build?

Usually, yes. Most of the work happens outside until the new room is weathertight. The disruptive part is knocking through to the house, which we do near the end behind a dust screen. Expect two to four weeks without a full kitchen; we set up a temporary sink and agree the date with you.

Dudley and the Black Country

House extensions across Dudley and nearby:

Book a free survey

Tell us a little about the job. We call back within one working day to arrange a time.

Or call us now0121 496 0358

No obligation. We call back within one working day.

This is an example site, so nothing was sent.

Call nowFree survey